Small stitches. Bright ideas. Something made by you.
buttonstudios.net / by REALLYBYTE

Original printables / by REALLYBYTE

A page to plan.
A line to follow.

Four focused packs, made for this little creative corner. Start with the free sample.

Try three real pages first.

A button-flower template, project brief and mending queue from the paid collections.

Download the free sample (PDF)

Actual cover of Button Craft Template CollectionActual inside page of Button Craft Template Collection

9 pages / A4 & US Letter

Button Craft Template Collection

Eight original button-placement motifs: flower, orbit, rainbow, leaf sprig, house, mountains, heart and garden trail. One full-page outline per motif, plus printing and project guidance. Templates for decorative adult craft projects, not garment patterns.

£1.99

Buy & download on Payhip

Opens Payhip checkout; check the listing before purchasing.

Actual cover of Sewing Project & Stash PlannerActual inside page of Sewing Project & Stash Planner

22 pages / A4 & US Letter

Sewing Project & Stash Planner

A 22-page workbook for project briefs, budgets, button/fabric/thread inventories, colour planning, measurements, preparation, session notes, finishing, care records and a project index.

£4.99

Buy & download on Payhip

Opens Payhip checkout; check the listing before purchasing.

Actual cover of Mending & Button Repair Record KitActual inside page of Mending & Button Repair Record Kit

6 pages / A4 & US Letter

Mending & Button Repair Record Kit

Six printable pages: an introduction, repair queue, button matching record, before-you-mend sheet, session record and aftercare review. A reusable record kit rather than a step-by-step repair manual.

£1.99

Buy & download on Payhip

Opens Payhip checkout; check the listing before purchasing.

Actual cover of Embroidery Sketch & Practice SamplerActual inside page of Embroidery Sketch & Practice Sampler

12 pages / A4 & US Letter

Embroidery Sketch & Practice Sampler

Eight original line motifs for tracing, plus a printing guide, stitch-test record, practice grid and finished-sampler review. Includes suggested ways to explore outlines; no completed stitch diagrams or fabric are supplied.

£4.99

Buy & download on Payhip

Opens Payhip checkout; check the listing before purchasing.

Before you buy

What will I receive?

Each product includes two PDFs with the same content: A4 and US Letter. Use the edition matching your paper. Files are for printing and handwriting or tracing; they are not fillable forms or editable templates. No physical supplies or completed projects are included.

Are the two motif collections different?

Yes. The button-art pack has eight button-placement layouts. The embroidery pack has eight different line motifs: fern, daisy chain, sailboat, tea cup, citrus branch, window plant, loops and hedgerow, plus practice and recording pages. It is a tracing sampler, not a stitch-by-stitch chart.

Can I give a finished project as a gift?

Yes, as a private physical gift under the personal and household-use licence. Commercial use, resale and redistribution of blank templates are not included.

How do I print?

Print at actual size / 100%, test one page and measure the 50 mm bar on motif sheets. Colour and greyscale both work. Use our printing guide if you want a reminder.

Printing and tracing guide →
Where do I pay and get the files?

Purchase and file delivery will use the REALLYBYTE Payhip product listings once the purchase links are connected. Check the listing and checkout for purchase terms. Contact info@reallybyte.com for product enquiries.

Shopping links are ads. As an Amazon Associate I earn from qualifying purchases. Amazon links open searches; compare the actual listing, dimensions, contents, suitability and seller before buying.